Tree Preservation Orders and Extensions: What You Can Do
Planning an extension near a tree with a tree preservation order? What needs council consent, how roots affect the design, and what to check before you build.
By Adam Mokhtar, Founder · · 6 min read
Quick answer
You can often extend near a protected tree, but you need the council's written consent before you cut, prune or damage it, and that includes its roots. Full planning permission can cover tree work that the approved extension makes necessary, but permitted development does not, so check whether a tree is protected before you design anything.
Tree Preservation Orders and Extensions: What You Can Do
A big tree near the back of the house can be the best thing about a garden. It can also be the thing that decides where, and how far, you can extend. If the tree is protected, you can't just take it down or cut through its roots to make room. The good news is that a protected tree doesn't automatically rule out an extension. You just need to plan around it from the start.
The short answer
If a tree has a tree preservation order (TPO), you need the council's written consent before you:
- cut it down or uproot it
- top or lop it (cut back the crown or branches)
- wilfully damage or destroy it
Damaging the roots counts. Digging foundations, laying a new patio or driving machinery over the roots of a protected tree can all be treated as damage.
There's one important exception. If you have full planning permission for your extension, work on a protected tree that is immediately needed to build what was approved doesn't need separate consent. But the council will have looked at the tree when it decided your application, and it often adds conditions to protect it during the build. Outline planning permission and permitted development don't give you this exception.
Trees in conservation areas
Even without a TPO, trees in a conservation area are protected in a similar way. If a tree has a trunk more than 7.5cm across, measured 1.5 metres above the ground, you must give the council six weeks' written notice before cutting it down or pruning it.
That six weeks gives the council time to decide whether the tree deserves a TPO. If it does, they can make one, and then you're back to needing consent.
How to check if a tree is protected
- Ask the council. The planning department or tree officer can tell you whether there's a TPO and whether you're in a conservation area. Use our local authority finder to find the right council.
- Look at the council's online map. Many councils publish maps of protected trees and conservation areas.
- Check next door's trees too. A TPO protects the tree wherever its branches and roots reach. A protected tree in a neighbour's garden can affect your extension just as much as one in yours.
- Run your address through the planning checker to see if other planning restrictions apply to your plot.
Not sure whether to build, wait or move? Get a straight answer — no pressure, no jargon.
Book a free Build, Wait or Move CallDo this before anyone starts drawing. It's frustrating to pay for a design that has to be redrawn because a protected tree turns up later.
Why the roots matter more than the branches
Most people think about the canopy. For an extension, the roots are usually the bigger issue.
Tree specialists use a British Standard (BS 5837) to work out a root protection area around each tree. As a rough guide, it's a circle with a radius of about 12 times the trunk's diameter, measured 1.5 metres off the ground. So a tree with a trunk 40cm across has a root protection area roughly 4.8 metres in every direction.
Building inside that area isn't always banned, but it needs care and usually the council's agreement. Common ways to make it work:
| Approach | What it means |
|---|---|
| Move or reshape the extension | Keep the footprint outside the root protection area. Often the simplest answer. |
| Special foundations | Piles or a raised slab that bridges over roots instead of cutting through them. A structural engineer designs these. |
| Protective fencing during the build | Keeps diggers, skips and stored materials off the roots. Councils often make this a condition. |
| Careful hand digging | Where you have to work close to the tree, roots are found by hand and protected rather than ripped out. |
If you apply for planning permission, the council may ask for a tree survey or an arboricultural impact assessment with your application. That's a report from a tree specialist showing which trees are affected and how they'll be protected. It's worth getting early, because it shapes the design.
Foundations and building regulations
Trees affect foundations even when they aren't protected. On clay soil, tree roots draw water out of the ground, and the soil shrinks and swells. Foundations near trees on clay often need to go deeper, and removing a large tree can cause the ground to swell back up. Building control will check this as part of your building regulations approval, so it's not something to leave to the builder on the day.
This is one of the costs that catches people out. Our guide to avoiding unexpected costs covers others worth checking early.
Not sure whether to build, wait or move? Get a straight answer — no pressure, no jargon.
Book a free Build, Wait or Move CallWhat happens if you ignore a TPO
Cutting down or destroying a protected tree without consent is a criminal offence. The most serious cases can lead to an unlimited fine, and you can be required to plant a replacement tree. Less serious damage can still lead to a fine. It can also come up when you sell, and it won't make the council any friendlier when you ask for planning permission next time.
There are limited exceptions for dead or dangerous trees, but you normally still need to tell the council first. If in doubt, ask before you act.
England and Wales
The basic system is the same in both countries. Councils make TPOs under the same Act, you need consent to work on a protected tree, and the six weeks' notice rule for conservation area trees applies in both.
The detailed regulations and application forms are different, though, and so are some of the exceptions. If you're in Wales, check with your council's tree officer and read our guide to planning permission in Wales for the other differences.
Should you still extend?
Often, yes. Plenty of good extensions sit next to protected trees, and a mature tree can make a new room feel settled straight away. But if the only way to get the space you want is to remove or badly cut back a protected tree, the honest answer is that you may not get consent. In that case, it's worth looking at a smaller extension, a loft conversion, or whether moving makes more sense. Our Build, Wait or Move framework helps you weigh that up.
If you do go ahead, our planning permission service can prepare drawings that show the tree, the root protection area and how the design keeps clear of it. You might also find our guide on whether you need planning permission useful.
Talk it through
If there's a big tree where you'd like to build and you're not sure what it means, bring it to a free Build, Wait or Move Call. We'll look at where the tree sits, what it's likely to mean for the design, and whether extending is still the right choice. Sometimes it's a small adjustment. Sometimes the better answer is to wait or think again, and we'll tell you that too.
Frequently asked questions
How do I find out if a tree has a tree preservation order?
Ask your local council's planning or tree officer. Many councils also have an online map showing protected trees and conservation areas. Your house purchase searches may mention it too, but orders can be made at any time, so check again before you start.
Can I cut back a neighbour's protected tree that hangs over my garden?
Not without consent. A tree preservation order protects the tree whoever owns it, so you need the council's permission before cutting overhanging branches or roots, even on your side of the boundary.
Does a tree preservation order stop me building under permitted development?
It doesn't stop the extension being permitted development, but permitted development doesn't give you the right to touch the tree. If the build would mean pruning it or digging through its roots, you still need tree consent from the council first.
Do I have to pay to apply for consent to work on a protected tree?
No, there's no fee for applying. You can apply through the Planning Portal or your council's own form. You may choose to pay a tree surgeon or arboriculturist to help you describe the work clearly.