Build Over Agreement: Can You Extend Over a Sewer?
When an extension needs a build over agreement: building over or within 3m of a public sewer, how to find the pipes, manholes, and what to do before you build.
6 min readPlanning permission gets your extension approved. Building regulations get it actually built safely, and signed off. We handle both, in-house, as part of the same fixed fee.
Fixed-fee scope
No hourly billing creep. You know exactly what you're getting and what it costs.
How it works
Your extension or conversion is designed and agreed before we move into regulations detail.
We prepare the technical drawings covering structure, insulation, ventilation and fire safety.
Drawings are submitted to building control, and we handle any queries that come back.
You hand your builder a set of drawings they can actually build from, not guess at.
Straight talk on cost
Real numbers, not guesswork. Build costs vary by home — our design fee is always fixed and agreed first.
Building regulations drawings
Included in your fixed design fee
Prepared in-house alongside your design and planning work — not a separate cost or a third party.
Learn first
Plain-English answers to the questions people ask us before they book a call.
When an extension needs a build over agreement: building over or within 3m of a public sewer, how to find the pipes, manholes, and what to do before you build.
6 min readHow long you have to start and sign off a house extension in the UK: the three-year rule for planning and building regulations, when to call building control, and what happens if you never get the completion certificate.
4 min readArchitect, architectural designer or structural engineer? What each one does on a home extension, when you need which, and whether you need both. Plain English, no sales pitch.
4 min readRecent project
“We chose them because they didn't just agree with us.”
A real building regulations project, designed around how the family actually lives. Full case study coming soon.
Read more reviews →No — they're separate. Planning permission decides whether you can build; building regulations cover how it's built safely (structure, insulation, fire safety, ventilation). Most projects need both, even ones that don't need planning permission at all.
We handle it in-house, as part of the same fixed fee as your design and planning work — not passed to a third party you've never spoken to.
Almost always, yes — even projects that fall under permitted development and don't need planning permission still need to meet building regulations. We build this into every project from the start.
They're included in your fixed design fee — we don't charge separately for them, and you won't get a surprise invoice partway through.
That's exactly what the call is for. We'll be straight with you — no pressure, no jargon, no nasty surprises.
We'd like to use analytics cookies to understand how the site is used. They're optional — the site works fully without them. See our cookie policy for details.